pvc edge banding

FOB price of PVC edge banding per roll

 

PVC edge banding

Size:1*36
Color:Marble color
Meter:100meters/Roll

Inquiry

Transparent Pricing: FOB Price Guide for PVC Edge Banding

We are committed to providing a clear and transparent pricing system to help you better plan your procurement budget and supply chain. Below is a reference for the FOB (Free On Board) price of PVC edge banding based on standard specifications.

FOB Pricing Basics

FOB (Free On Board) Price Includes:

  • Product cost

  • Factory packaging

  • Export documentation preparation

  • Cost of loading goods onto the designated vessel at the port of shipment

Does Not Include:

  • International sea/air freight

  • Insurance

  • Import duties and taxes in the destination country

  • Customs clearance and local transportation at the destination port

     

     

    Key Factors Influencing FOB Price

    1. Material Cost Drivers

    • PVC Raw Material Grade: Food/medical grade vs. industrial grade

    • Adhesive Type: EVA (economical) vs. PUR (high-performance)

    • Surface Finish: Gloss/matte/soft-touch/embossed

    • Printing Technology: Standard printing vs. high-definition digital printing

      Price Validity and Adjustment Mechanism

      • Quotation Validity: Typically 30 days (subject to raw material price fluctuations)

      • Price Adjustment Triggers:

        • PVC resin price fluctuations exceeding ±5%

        • RMB to USD exchange rate changes exceeding ±3%

        • Government export policy or tax rate adjustments

      • Long-Term Agreements: Annual purchase agreements can lock prices for 3–6 months

        How to Obtain an Accurate Quotation

        Provide the Following Information for a Formal FOB Quotation:

        1. Product specifications (thickness, width, length/roll)

        2. Surface requirements (color/texture/gloss level)

        3. Adhesive type (EVA or PUR)

        4. Required quantity (number of rolls or total meters)

        5. Target port of shipment

        6. Desired delivery timeline

          Process Steps:

          1. Request Quotation → Provide detailed requirements

          2. Confirm Samples → Request samples to verify quality first

          3. Receive Proforma Invoice → Includes complete price terms

          4. Place Order for Production → Pay deposit to schedule production

          5. Pre-Shipment Inspection → Arrange on-site or video inspection

          6. Final Payment and Shipment → Provide shipping documents